KIT plate Panel Pool Galvanized - Model GAIA

Marca: REDPOOL

Price
32.892 zł
Tax included. Shipping calculated at checkout.
size: Armada 5x3 Screen

KIT plate Panel Pool Galvanized - Model GAIA

size
Price
Armada 5x3 Screen
Price
32.892 zł
Armada 6x3 Screen
Price
36.071 zł
7x3.5 Armada Screen
Price
42.490 zł
Armada 8x4 Screen
Price
48.348 zł
Armada 9x4 Screen
Price
51.504 zł
Armada 10x4 Screen
Price
57.729 zł
Armada 10x5 Screen
Price
62.194 zł
Armada 11x5 Screen
Price
64.834 zł
Armada 12x6 Screen
Price
77.579 zł
Installation up pool 8x4. North Zone
Price
17.684 zł
Installation starting pool of 9x4. North Zone
Price
19.895 zł
5x3 Liner
Price
25.195 zł
6x3 Liner
Price
28.458 zł
7x3,5 Liner
Price
32.910 zł
8x4 Liner
Price
37.574 zł
9x4 Liner
Price
40.938 zł
10x4 Liner
Price
44.205 zł
10x5 Liner
Price
48.114 zł
11x5 Liner
Price
50.784 zł
12x6 Liner
Price
57.994 zł
Installation up pool 8x4. South Zone
Price
22.105 zł
Installation starting pool of 9x4. South Zone
Price
26.526 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 5, 6 and 7mts
Price
5.107 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 8, 9 and 10mts
Price
6.574 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 11 and 12mts
Price
8.016 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Ladder Corner
Price
5.460 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Caseta BIG buried for technical room
Price
4.815 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Caseta Surface for technical room
Price
1.764 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Right staircase and indoor spa
Price
18.524 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Staircase right with bench/beach
Price
12.158 zł
Compare product options
Available for dispatch. Contact us!
American Express
Apple Pay
Google Pay
Maestro
Mastercard
PayPal
Shop Pay
Union Pay
Visa
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL

KIT plate Panel Pool Galvanized - Model GAIA

Armada 5x3 Screen

Price
32.892 zł
Armada 5x3 Screen

Product information

Brand REDPOOL

 Technique Steel + Concrete + Liner

25-year guarantee on the structure and 15-year guarantee on the liner. (10% degressive guarantee per year)

The REDPOOL technique combines the strength of steel and the robustness of concrete with the elasticity and watertightness of the liner.

Quick to install (3-4 days).

Pool kit includes:

  • STANDARD STRUCTURE KIT - Complete structure in 2 mm thick STEELPANEL steel, composed of:
  • Steel panels 1.4mt and 1.1mt high and 1mt long.
  • Props
  • Galvanized nuts and bolts
  • Aluminum tape
  • OPTIONAL: Edge gutter
  • Liner 75/100 which includes: (OPTIONAL)
  • Liner plain colour 75/100
  • PVC Hung profile and respective corners to fix the liner
  • Locking joint
  • Self-drilling screws
  • Liner in reinforced fabric including  (OPTIONAL)
  • Smooth reinforced screen 150/100
  • Hung PVC profile and respective corners to fix the liner
  • Locking joint
  • Self-drilling screws
  • Recessed material (Recessed), which includes: 
  • A400 Skimmer
  • Reflux (impulsion mouth)
  • Suction socket
  • Bottom drain
  • Projector 12V 300W
  • Connection box
  • Filtration system, OPTIONAL included in the INSTALLATION, includes:
  • Sand filter
  • Self-priming pump with prefilter
  • Electric panel with transformer and 30mA differential
  • Accessories, OPTIONAL included in the installation, include
  • Telescopic pole
  • Manual aspirator
  • Floating tube
  • Chlorine-ph analysis kit
  • Thermometer
  • Amanha leaves
  • Camaroeiro
  • Wall brush
  • Installation of panels and engine room (OPTIONAL)
  • Edging: Edging kit GRANITUS model (OPTIONAL) - Does not include application
  • Interior corner stairs (OPTIONAL)
  • Underground case for technical place (OPTIONAL)
  • Surface casing for the technical room (OPTIONAL)

 


Does not include:

Excavation (estimated value of 500€ with a local excavation company and if there is direct access to the pool site by machinery)

Civil construction of the slab of the measure corresponding to the pool in composite bottom as explained below. (values between 650€ and 1200€ in a local construction company)

Civil construction of the technical room

Laying of water, sewage/rainwater and electricity in the technical room.

Placing concrete/cement on the outside corner between the panel and the existing concrete slab. (mandatory)

Grounding of pool (Placing earth around the panels before filling the pool with water.

 


Pools available in the following sizes

5,00x3,00mts
6,00x3,00mts
7,00x3,50mts
8,00x4,00mts
9,00x4,00mts
10.00x4.00mts
10.00x5.00mts
11.00x5.00mts
12,00x6,00mts 

 

Installation:

It is possible to buy the pool and installation, to do the installation it is necessary to have a flat concrete base on the periphery of the pool with a minimum of 0.5 outside the pool area and already existing place with a curing period of more than 1 week.


Application of the panels on the slab with chemical dowel

Types of slabs:

  • Flat Bottom, account for an extra 0.5mt all around the pool, example: 6x3 pool, the slab should be 7x4.
  • Pyramid Bottom, on the periphery the pool should be all aligned and descend in the centre of the pool, example: 8x4 pool, the slab should be 9x5.
  • Composite Bottom, on the bottom there are two different levels, one with the deepest level and another with the shallowest level, the transition should be done with a 1mts ramp. 

  

NOTE: All pools are supplied with a 1,1 mt height panel but the pool depth can have a maximum of 2,0 mts with a composite or pyramid bottom.


OPTIONALS AVAILABLE:

  • Liner lining
  • Liner Lining
  • Swimming pool border


NOTE: The Base pool does not have Lining


Characteristics detailed in the photographs:

 1- Carrying out the Excavation

Due to its importance, it should be done conscientiously. Under normal conditions it is done in one day. 

2- Concrete work

The slab must have a completely smooth finish, free of irregularities, with an average thickness of 10/15cm.

3-Fixing of Panels

The steel panels are mounted directly on the bottom slab. After being bolted, they are levelled and plumbed.

4-Laying the coping

After the backfill, a concrete strap is made to place the border.

5-Fitting the Liner

Completely computer-designed, without limitations, it adjusts perfectly to any model. The liner is installed in just a few hours.

6- Connecting the Machines

After all piping is done, the connection of the filtration equipment in the engine room is usually done on the day of the filling.