Technical Steel + Concrete + Liner
25 years warranty on the structure and 15 years in the liner (digressive guarantee of 10% per year.)
REDPOOL technique combines the strength of steel and concrete strength with elasticity and sealing liner.
installation (between 3-4 days).
pool ZEUS Kit includes:
Does not include:
Pools available in the following sizes:
Installation:
You can purchase the pool and the installation. To make the installation you must have a flat concrete base on the edge of the pool with a minimum of 1.0 out of the pool area and existing site with a higher curing period of 1 week.
Application of the slab panels with chemical bushing
Types slabs:
Note: All pools are provided with panel 1,1mt tall but the depth of the pool can have a maximum 2,0mts Background compound or pyramid
OPTIONS AVAILABLE:
NOTE: The Base pool has no coating
Features Detailed in photos: