Technique Steel + Concrete + Liner
25-year guarantee on the structure and 15-year guarantee on the liner. (10% degressive guarantee per year)
The REDPOOL technique combines the strength of steel and the robustness of concrete with the elasticity and watertightness of the liner.
Quick to install (3-4 days).
Pool kit includes:
Does not include:
Excavation (estimated value of 500€ with a local excavation company and if there is direct access to the pool site by machinery)
Civil construction of the slab of the measure corresponding to the pool in composite bottom as explained below. (values between 650€ and 1200€ in a local construction company)
Civil construction of the technical room
Laying of water, sewage/rainwater and electricity in the technical room.
Placing concrete/cement on the outside corner between the panel and the existing concrete slab. (mandatory)
Grounding of pool (Placing earth around the panels before filling the pool with water.
Pools available in the following sizes
5,00x3,00mts
6,00x3,00mts
7,00x3,50mts
8,00x4,00mts
9,00x4,00mts
10.00x4.00mts
10.00x5.00mts
11.00x5.00mts
12,00x6,00mts
Installation:
It is possible to buy the pool and installation, to do the installation it is necessary to have a flat concrete base on the periphery of the pool with a minimum of 0.5 outside the pool area and already existing place with a curing period of more than 1 week.
Application of the panels on the slab with chemical dowel
Types of slabs:
NOTE: All pools are supplied with a 1,1 mt height panel but the pool depth can have a maximum of 2,0 mts with a composite or pyramid bottom.
OPTIONALS AVAILABLE:
NOTE: The Base pool does not have Lining
Characteristics detailed in the photographs:
1- Carrying out the Excavation
Due to its importance, it should be done conscientiously. Under normal conditions it is done in one day.
2- Concrete work
The slab must have a completely smooth finish, free of irregularities, with an average thickness of 10/15cm.
3-Fixing of Panels
The steel panels are mounted directly on the bottom slab. After being bolted, they are levelled and plumbed.
4-Laying the coping
After the backfill, a concrete strap is made to place the border.
5-Fitting the Liner
Completely computer-designed, without limitations, it adjusts perfectly to any model. The liner is installed in just a few hours.
6- Connecting the Machines
After all piping is done, the connection of the filtration equipment in the engine room is usually done on the day of the filling.