KIT plate Panel Pool Galvanized - Model GAIA

Marca: REDPOOL

Preis
32.362 zł
Steuern inklusive. Versand wird an der Kasse berechnet.
Größe: 5x3 gepanzerter Bildschirm

KIT plate Panel Pool Galvanized - Model GAIA

Größe
Preis
5x3 gepanzerter Bildschirm
Preis
32.362 zł
6x3 gepanzerte Leinwand
Preis
35.490 zł
7 x 3,5 bewaffneter Bildschirm
Preis
41.805 zł
8x4 bewaffneter Bildschirm
Preis
47.569 zł
9x4 Gepanzertes Segeltuch
Preis
50.674 zł
10x4 Gepanzertes Segeltuch
Preis
56.799 zł
10x5 Gepanzertes Segeltuch
Preis
61.192 zł
11x5 Gepanzertes Segeltuch
Preis
63.789 zł
Armada 12x6 Screen
Preis
76.329 zł
Installation up pool 8x4. North Zone
Preis
17.399 zł
Installation starting pool of 9x4. North Zone
Preis
19.574 zł
5x3 Liner
Preis
24.789 zł
6x3 Liner
Preis
27.999 zł
7x3,5 Liner
Preis
32.380 zł
8x4 Liner
Preis
36.968 zł
9x4 Liner
Preis
40.279 zł
10x4 Liner
Preis
43.493 zł
10x5 Liner
Preis
47.338 zł
11x5 Liner
Preis
49.965 zł
12x6 Liner
Preis
57.060 zł
Installation up pool 8x4. South Zone
Preis
21.749 zł
Installation starting pool of 9x4. South Zone
Preis
26.099 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 5, 6 and 7mts
Preis
5.024 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 8, 9 and 10mts
Preis
6.468 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Surround w / pool 11 and 12mts
Preis
7.886 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Ladder Corner
Preis
5.372 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Caseta BIG buried for technical room
Preis
4.737 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Caseta Surface for technical room
Preis
1.736 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Right staircase and indoor spa
Preis
18.226 zł
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL
Staircase right with bench/beach
Preis
11.962 zł
Vergleichen Sie Produktoptionen
Verfügbar für den Versand. Kontaktieren Sie uns!
American Express
Apple Pay
Google Pay
Maestro
Mastercard
PayPal
Shop Pay
Union Pay
Visa
KIT de Piscina de Painel de Chapa Galvanizada - Modelo GAIA - IOT-POOL

KIT plate Panel Pool Galvanized - Model GAIA

5x3 gepanzerter Bildschirm

Preis
32.362 zł
5x3 gepanzerter Bildschirm

Informationen zum Produkt

Marke REDPOOL

 Technique Steel + Concrete + Liner

25-year guarantee on the structure and 15-year guarantee on the liner. (10% degressive guarantee per year)

The REDPOOL technique combines the strength of steel and the robustness of concrete with the elasticity and watertightness of the liner.

Quick to install (3-4 days).

Pool kit includes:

  • STANDARD STRUCTURE KIT - Complete structure in 2 mm thick STEELPANEL steel, composed of:
  • Steel panels 1.4mt and 1.1mt high and 1mt long.
  • Props
  • Galvanized nuts and bolts
  • Aluminum tape
  • OPTIONAL: Edge gutter
  • Liner 75/100 which includes: (OPTIONAL)
  • Liner plain colour 75/100
  • PVC Hung profile and respective corners to fix the liner
  • Locking joint
  • Self-drilling screws
  • Liner in reinforced fabric including  (OPTIONAL)
  • Smooth reinforced screen 150/100
  • Hung PVC profile and respective corners to fix the liner
  • Locking joint
  • Self-drilling screws
  • Recessed material (Recessed), which includes: 
  • A400 Skimmer
  • Reflux (impulsion mouth)
  • Suction socket
  • Bottom drain
  • Projector 12V 300W
  • Connection box
  • Filtration system, OPTIONAL included in the INSTALLATION, includes:
  • Sand filter
  • Self-priming pump with prefilter
  • Electric panel with transformer and 30mA differential
  • Accessories, OPTIONAL included in the installation, include
  • Telescopic pole
  • Manual aspirator
  • Floating tube
  • Chlorine-ph analysis kit
  • Thermometer
  • Amanha leaves
  • Camaroeiro
  • Wall brush
  • Installation of panels and engine room (OPTIONAL)
  • Edging: Edging kit GRANITUS model (OPTIONAL) - Does not include application
  • Interior corner stairs (OPTIONAL)
  • Underground case for technical place (OPTIONAL)
  • Surface casing for the technical room (OPTIONAL)

 


Does not include:

Excavation (estimated value of 500€ with a local excavation company and if there is direct access to the pool site by machinery)

Civil construction of the slab of the measure corresponding to the pool in composite bottom as explained below. (values between 650€ and 1200€ in a local construction company)

Civil construction of the technical room

Laying of water, sewage/rainwater and electricity in the technical room.

Placing concrete/cement on the outside corner between the panel and the existing concrete slab. (mandatory)

Grounding of pool (Placing earth around the panels before filling the pool with water.

 


Pools available in the following sizes

5,00x3,00mts
6,00x3,00mts
7,00x3,50mts
8,00x4,00mts
9,00x4,00mts
10.00x4.00mts
10.00x5.00mts
11.00x5.00mts
12,00x6,00mts 

 

Installation:

It is possible to buy the pool and installation, to do the installation it is necessary to have a flat concrete base on the periphery of the pool with a minimum of 0.5 outside the pool area and already existing place with a curing period of more than 1 week.


Application of the panels on the slab with chemical dowel

Types of slabs:

  • Flat Bottom, account for an extra 0.5mt all around the pool, example: 6x3 pool, the slab should be 7x4.
  • Pyramid Bottom, on the periphery the pool should be all aligned and descend in the centre of the pool, example: 8x4 pool, the slab should be 9x5.
  • Composite Bottom, on the bottom there are two different levels, one with the deepest level and another with the shallowest level, the transition should be done with a 1mts ramp. 

  

NOTE: All pools are supplied with a 1,1 mt height panel but the pool depth can have a maximum of 2,0 mts with a composite or pyramid bottom.


OPTIONALS AVAILABLE:

  • Liner lining
  • Liner Lining
  • Swimming pool border


NOTE: The Base pool does not have Lining


Characteristics detailed in the photographs:

 1- Carrying out the Excavation

Due to its importance, it should be done conscientiously. Under normal conditions it is done in one day. 

2- Concrete work

The slab must have a completely smooth finish, free of irregularities, with an average thickness of 10/15cm.

3-Fixing of Panels

The steel panels are mounted directly on the bottom slab. After being bolted, they are levelled and plumbed.

4-Laying the coping

After the backfill, a concrete strap is made to place the border.

5-Fitting the Liner

Completely computer-designed, without limitations, it adjusts perfectly to any model. The liner is installed in just a few hours.

6- Connecting the Machines

After all piping is done, the connection of the filtration equipment in the engine room is usually done on the day of the filling.